Fly Ash Pond

Design Criteria

Information will be posted as applicable requirements are reached and met.

Location Requirements

Information will be posted as applicable requirements are reached and met.

Operating Criteria

Information will be posted as applicable requirements are reached and met.  The Fugitive Dust Control Plan may be accessed from the Facility Wide CCR Documentation link.

Groundwater Monitoring

Information will be posted as applicable requirements are reached and met. 

Closure and Post-Closure

In accordance with USEPA 40 CFR Part 257, Section 106 – Notification Requirements, Sikeston Power Station has submitted this notification to initiate closure of our Fly Ash Pond, a CCR surface impoundment, to the Missouri State Director, as defined under 257.53. The inactive Fly Ash Pond is one of two CCR surface impoundments at the Sikeston Power Station (SPS). The other CCR surface impoundment, referred to as the Bottom Ash/Scrubber Sludge Pond, will remain an active CCR surface impoundment. As an inactive CCR surface impoundment, the inactive Fly Ash Pond will be closed under the requirements of 40 CFR 257.100, paragraph (b).

Fly Ash Impoundment Closure

Sikeston Power Plant
1551 W. Wakefield Avenue | Sikeston, MO 63801
Phone: 573-471-5000 | info@sikestonpower.com | login