Scrubber Sludge/Bottom Ash Pond

Design Criteria

In accordance with 40 CFR Part 257.71, the Bottom Ash Pond Clay Liner Evaluation is now complete and available in the on-site operating record and this website §257.107(f)(3).

In accordance with 40 CFR Part 257.73(a)(2), the Bottom Ash Periodic Hazard Potential Classification Assessment is now complete and available in the on-site operating record and this website §257.107(f)(4).

In accordance with 40 CFR Part 257.73(c)(1), the Bottom Ash History of Construction is now complete and available in the on-site operating record and this website §257.107(f)(8).

In accordance with 40 CFR Part 257.73(d), the Bottom Ash Structural Stability Assessment is now complete and available in the on-site operating record and this website §257.107(f)(9).

In accordance with 40 CFR Part 257.73(e), the Bottom Ash Safety Factor Assessment is now complete and available in the on-site operating record and this website.

Clay Liner Evaluation
Periodic Hazard Potential Classification Assessment
Structural Stability Assessment
Safety Factor Assessment
History of Construction

Location Requirements

Information will be posted as applicable requirements are reached and met. 

Operating Criteria

Information will be posted as applicable requirements are reached and met.  The Fugitive Dust Control Plan may be accessed from the Facility Wide CCR Documentation link.

In accordance with 40 CFR Part 257.83(b), the 2015 Annual Inspection Report is now complete and available in the on-site operating record and this website. 

In accordance with 40 CFR Part 257.82, the Inflow Design Flood Control System Plan is now complete and available in the on-site operating record and this website §257.107(g)(4).

In accordance with 40 CFR Part 257.83(b), the 2016 Annual Inspection Report is now complete and available in the on-site operating record and this website. 

In accordance with 40 CFR Part 257.73(a)(3), the 2017 Emergency Action Plan for the Bottom Ash Pond is now complete and available in the on-site operating record and this website.

2015 Annual P.E. Inspection of Bottom Ash and Scrubber Sludge Pond
Inflow Design Flood Control System Plan
2016 Annual P.E. Inspection of Bottom Ash and Scrubber Sludge Pond
2017 Bottom Ash Emergency Action Plan

Groundwater Monitoring

In accordance with 40 CFR Part 257.91(f), Professional Engineer's Certification of Groundwater Monitoring System is now complete and available in the on-site operating record and this website [40 CFR 257.107(h)(2)]. 

In accordance with 40 CFR Part 257.93(f)(6), Professional Engineer's Certification of Groundwater Monitoring Statistical Method is now complete and available in the on-site operating record and this website [(40 CFR 257.107(h)(3)]. 

Additional information will be posted as applicable requirements are reached and met. 

PE Certification of Groundwater Monitoring System
PE Certification of Selected Statistical Method

Closure and Post-Closure

In accordance with 40 CFR Part 257.102 (2), the Bottom Ash Pond Closure Plan is now complete and available in the on-site operating record and this website §257.107(i)(4).

In accordance with 40 CFR Part 257.104, the Bottom Ash Pond Post-Closure Plan is now complete and available in the on-site operating record and this website §257.107(i)(12).

Final Closure Plan
Final Post Closure Plan

Sikeston Power Plant
1551 W. Wakefield Avenue | Sikeston, MO 63801
Phone: 573-471-5000 | info@sikestonpower.com | login