Facility Wide CCR Documentation

Facility Wide CCR Documenation will cover requirements intended to apply to all CCR units at the facility.

Of first conern, this section will address the Fugitive Dust Control Plan. The purpose of this plan is to establish measures to control fugitive dust from coal combustion residuals (CCR) in accordance with the Code of Federal Regulations, Title 40 - Protection of Environment, Part 257 - Criteria for Classification of Solid Waste Disposal Facilities and Practices, Subpart D - Standards for the Disposal of Coal Combustion Residuals in Landfills and Suface Impoundments, Section 80 - Air Criteria (40 CFR 257.80).

Also included on this page is the document that serves as SBMU's Demonstration for a Site-Specific Alternate to Initiation of Closure Deadline pursuant to 40 C.F.R. § 257.103(f)(1) for the Bottom Ash Pond at the Sikeston Power Plant (Sikeston), located near Sikeston, Missouri. The Bottom Ash Pond qualifies as an "eligible unlined CCR surface impoundment" as defined under 40 C.F.R. § 257.53. 

2016 Annual Fugitive Dust Control Report
2017 Annual Fugitive Dust Control Report
2018 Annual Fugitive Dust Control Report
2019 Annual Fugitive Dust Control Report
2020 Annual Fugitive Dust Control Report
2021 Annual Fugitive Dust Control Report
2022 Annual Fugitive Dust Control Report
Fugitive Dust Control Plan for Sikeston Power Station
Sikeston BMU Site Specific Extension Request
Sikeston BMU Site Specific Extension Request Rev 1
Sikeston BMU Site Specific Extension Request Completeness Letter
Sikeston BMU Site Specific Extension Request Update